Key points

  • Installers handle site prep, fuel connection, transfer switch wiring and permits, and licensing requirements for the work vary by state and locality.
  • Actual installation takes hours, but preparation can take multiple weeks.
  • Sizing your loads correctly keeps you from buying an undersized or needlessly large unit.
  • Licensing and permit rules vary by state and city, so check local requirements before hiring.
TermMeaningWhy it matters
Standby generatorA fixed unit on a pad outside the home, fed by a fuel line.It starts on its own when utility power drops.
Transfer switchA switch beside the main breaker box that moves the house between utility and generator power.It prevents backfeeding the grid and starts the generator automatically.
Site consultationAn at-home visit to review placement, fuel source and restrictions.It sets the scope your quote is based on.

What generator installers do

A full installation covers more than setting a box in the yard.

Generator installers cost

Price depends on generator size, fuel type, distance to the panel and site work.

Backup generator installers: sizing questions

A good installer sizes the unit to your loads rather than guessing from square footage alone.

Generator installers: vetting checklist

Check credentials and paperwork before any work begins.

Generator installers: what the timeline looks like

Installation day is short, but the lead-up is not.

Frequently asked questions

Do generator installers need to be licensed?

Licensing varies by state and city. Wiring a transfer switch is electrical work, so use a licensed electrician, and check with your state licensing board and local building department about gas and permit requirements.

How long does a generator installation take?

The installation itself takes hours. Preparation can take multiple weeks, depending on dealer availability, site preparation, gas line preparation and getting a permit approved.

Do I need a transfer switch?

A standby setup uses a transfer switch next to the main breaker box. It moves your home onto generator power and starts the generator automatically after a utility outage.

How often should a generator be serviced?

Plan for at least one annual visit. Units under heavy use may need service semiannually or quarterly, so ask your installer for a schedule matching how you use it.

Next step: talk to a licensed electrician

If you are comparing installers, start with your panel and the loads you need covered. Quantra Electrician can send a licensed electrician to look at your setup and discuss transfer switch options.

Check local permit rules before work starts.

Related guides

Request a quote

Tell us what you need and we will get back to you.